After passing the plumbing inspection, Mickey got back to work on the shower.
Plywood and hardiebacker completed.
Painting on a weird blue waterproof layer (that's not its official name).
It's such an aquatic color!
Tile for the curb and stones for the floor.
Grouted! (mostly)
Walls tiled and porcelain tiling units installed.
The finished product, including grout, shower fixtures, and a lamp.
And of course the completed floor!
Next to the shower, the utility sink.
On the opposite side of the bathroom, the bathroom sink.
While in the basement, the water in the cistern patiently waits.
From the cistern to the pressure tank, to the hot water heater, and beyond!